Interlock in Bradford West Gwillimbury
If you want another parking space in Bradford West Gwillimbury, measure the driveway at the garage, the property line, and the curb before you ask for quotes. A widening plan may fit on your lot and still need changes where it crosses the boulevard. For a backyard patio, locate the drainage swale before laying out the edges.
Paving, widening, and fill
The Town regulates driveway width on private property through zoning and prohibits blocking drainage swales. On a Town road, get approval before widening, moving, or altering an entrance. The Town also requires a permit to pave the portion of an existing entrance within the road allowance. If the crew needs to stage equipment, material, or a bin on the roadway or boulevard, check the separate Road Occupancy Permit requirements. [Town driveway paving and widening guidance](https://www.townofbwg.com/living-in-bwg/roads-and-transit/driveway-paving-and-widening/) · [Town entrance rules](https://www.townofbwg.com/living-in-bwg/by-laws/frequently-requested-by-laws/entrance-and-driveway-width-extension-by-law-2017-78/) · [Road Occupancy Permits](https://www.townofbwg.com/living-in-bwg/roads-and-transit/road-occupancy-permits/)
Placing fill or changing the grade generally requires a site alteration permit unless an exemption applies. If a patio needs fill to meet a back door or retaining wall, show Development Engineering the proposed levels. For a property near a watercourse or wetland, confirm whether the project needs conservation authority approval. [Town fill and grading rules](https://www.townofbwg.com/living-in-bwg/by-laws/frequently-requested-by-laws/fill-and-site-alteration-by-law-2017-33/) · [Town building and conservation guidance](https://www.townofbwg.com/living-in-bwg/building-and-renovating/)
Soil, access, and season
The Town identifies organic muck soils in the Holland Marsh. If you are budgeting a project in or near the marsh, have the contractor check the soil and drainage at the actual paving area. If the crew finds soft organic material, the base design and the amount of soil to haul away can change. On a narrow Bradford lot, check the width of the equipment route. For a long drive outside the built-up area, include the full paved area and any turning space. [Town overview of the Holland Marsh](https://www.townofbwg.com/recreation-culture/history-and-heritage/)
Plan for late spring through fall when the ground can be compacted. For an early start, check whether Bradford West Gwillimbury’s spring reduced-load rules affect the trucks serving your address. Smaller truckloads can mean extra trips. [Town load-limit map](https://www.townofbwg.com/Website-Documents/1_Living-in-BWG/Roads-and-Transit/Load-Limit-Map.pdf)
Compare written quotes
Ask each contractor to price the same paving area and to itemize removals, the compacted base, pavers, drainage, and any work on the boulevard.
- Where is the property line, what is the permitted width on each side of it, and who gets the approvals?
- How will you protect the swale and water shut-off valve, and who pays to restore disturbed areas?
- What aggregate, compacted thickness, and edge restraints are included?
- How will you price added excavation if you uncover soft ground or buried material?
- Does the workmanship warranty cover settlement, edge movement, or ponding?