Interlock in Burlington
Before you choose pavers for a Burlington driveway, measure the lot frontage and decide whether the existing entrance can stay. For a backyard patio, start with the slope from the house to the edge of the yard. Both measurements can change what you can build and what a contractor needs to include in the price.
Driveway and patio permits
Burlington generally requires a driveway modification permit before you alter an existing driveway unless the work is subject to site plan approval. Widening, adding a second entrance, or changing to a circular layout can bring the work under the driveway modification bylaw. The permitted driveway width depends on the width of the property. The City arranges changes to the curb or sidewalk, and driveway work that adds paved area can also need Niagara Escarpment Commission approval where applicable. If you plan to replace asphalt with pavers in the same footprint, ask the City how it classifies that work before pricing the apron. [Burlington driveways and curbs](https://www.burlington.ca/building-and-renovating/driveways-and-curbs/)
An uncovered patio at ground level is exempt from a building permit. Excavating or changing the grade for the same patio can still trigger a site alteration permit. Use Burlington’s screening checklist before committing to finished elevations, especially if the design needs a retaining wall or changes where runoff goes. Verify tree permit requirements if excavation approaches a public or private tree. [Burlington building permits](https://www.burlington.ca/building-and-renovating/building-permits/) · [Site alteration permits and screening checklist](https://www.burlington.ca/planning-and-development/development-applications/site-alteration-permits/)
Lot width and drainage
On a narrow lot, show the contractor the clear width from the side gate to the patio location. A small patio can still take substantial labour if the crew has to carry stone in and excavated soil out by hand. A wider lot may offer room for a loader and aggregate delivery. A mature tree or a slope can dictate where that equipment can go.
If your yard borders a creek or has a low point that already ponds, ask the contractor to trace the water’s route on the site sketch. Along Rambo Creek, the City has identified runoff from a nearby parking lot as a contributor to creek-bank erosion. Where the excavation exposes wet or soft soil, ask how they will prepare it to support the base and where water will drain. [Burlington Rambo Creek erosion assessment](https://www.burlington.ca/news-and-notices/posts/stormwater-management-projects/rambo-creek-erosion-control-project-between-victoria-avenue-and-emerald-crescent/)
When to build
Plan for work between the spring thaw and sustained fall freezes. A wet backyard can take longer to become workable than the driveway. For a late-season job, ask what weather would postpone excavation, compaction, or joint sanding. If the City needs to arrange curb work, get that date into the schedule before you plan to give up driveway access.
Compare written quotes
Ask for separate prices for removal and disposal, the compacted base, pavers and edge restraints, drainage, and restoration. A deeper excavation means more material to haul away and more aggregate to bring in. On a sloping lot, a wall or a step can change the scope more than the paver pattern does.
Give each Burlington contractor the same sketch and ask for written answers.
- What driveway width did you price at the lot line, and who confirms it with the City?
- Who handles permits and coordinates the curb work, and which fees or restoration costs are included?
- What base thickness after compaction and what paver specification did you allow for vehicle traffic?
- How will the finished surface drain around the house, tree roots, and any existing swale?
- What triggers an extra charge for soft soil or hand excavation, and what does the workmanship warranty cover if pavers settle?