Interlock in New Tecumseth
Before you price a driveway in Alliston, Beeton, or Tottenham, mark where your property ends and the road allowance begins. For a patio, mark the finished height at the back door and the path that rainwater takes across the yard. Those details can change the scope before you choose a paver.
Check the entrance and grading
For a new or widened entrance onto a Town road, ask Public Works about a Property Access Permit. The application asks for the existing and proposed widths, the surfacing material, and any curb cut or culvert work. If the crew will work in or occupy the road allowance, confirm whether it also needs a Road Occupancy Permit. For a County road, check with Simcoe County. [Town permits](https://www.newtecumseth.ca/live-here/services/applications-licences-permits/) · [Property Access Permit application](https://www.newtecumseth.ca/en/resources/Public-Works/Property-Access-Permit-Application---Fillable-Form.pdf) · [Simcoe County road permits](https://simcoe.ca/residents/trs/permits-and-fees/)
Driveway topping and minor landscaping can qualify for an exception to the site alteration permit requirement. The Town applies different volume limits inside and outside urban settlement boundaries, along with conditions on prior grade changes and minimum standards. If the job adds a parking pad, rebuilds the base, or raises a patio, give Engineering the excavation and fill estimates and ask whether the exception applies. Keep existing drainage swales open and have Planning confirm any parking or driveway limits for your lot. [Town site alteration and lot grading guidance](https://www.newtecumseth.ca/build-here/development/site-alterations/) · [Town zoning maps and rules](https://www.newtecumseth.ca/build-here/development/zoning-and-arus/)
Access, soil, and timing
On a narrow lot, measure the side gate and ask what equipment can reach the patio. On a rural lot, price the full paved length and any turnaround, and check whether the entrance crosses a ditch. Have the contractor inspect the soil below the existing surface. Soft or wet ground can add excavation and aggregate, and water left in the base can contribute to frost heave.
Plan installation from late spring into fall as ground conditions allow. Wait for the subgrade to firm up after thaw, and check spring load limits on the route before scheduling gravel deliveries or soil removal. [Simcoe County reduced-load information](https://simcoe.ca/residents/service-simcoe/)
Compare written quotes
Give each contractor the same driveway or patio dimensions. Ask for separate prices for removing the old surface, hauling soil, building the base, and restoring the lawn or roadside.
- How deep will you excavate, and what compacted base and edge restraints does my driveway or patio need?
- Where will runoff go, and how will you keep the existing swale working?
- Who handles access permits and inspections? Does the quote include any culvert, curb, or boulevard work?
- If you find soft ground, how will you price the extra work? What does the written warranty cover if pavers settle?